Desa Dinuk terletak di Kecamatan Kramat, Kabupaten Tegal, Provinsi Jawa Tengah memiliki luas sekitar 124 hektar, dihuni oleh 2.918 penduduk. Dalam rangka pengembangan saluran pipa air minum yang dilakukan oleh Perumda Air Minum Tirta Ayu di unit layanan cabang Mejasem pada tahun 2023, maka dilakukan perencanaan untuk memastikan terpenuhinya kebutuhan air minum dengan pelayanan 100% masyarakat Desa Dinuk hingga tahun 2034. Proyeksi jumlah penduduk selama 10 tahun diperlukan untuk menghitung total kebutuhan air minum sehingga dapat diketahui pada tahun 2034 terdapat 8.142 jiwa. Hasil total kebutuhan air digunakan untuk mendesain jaringan pipa distribusi dengan simulasi di EPANET. Kebutuhan jam puncak pada tahun 2034 sebesar 14,1649 l/s digunakan sebagai dasar perencanaan. Simulasi EPANET menghasilkan tekanan air yang berada pada rentang 8,67 m hingga 29,84 m pada 38 titik, dan kecepatan aliran air berada pada rentang 0,08 m/s hingga 1,7 m/s. Simulasi EPANET dilakukan dengan menggunakan jenis pipa PVC berdiameter 100 mm. Perencanaan ini menghasilkan rencana anggaran biaya sebesar Rp. 884.679.726. Kata kunci : jaringan distribusi air, jaringan pipa, kebutuhan air, Desa Dinuk The village of Dinuk is located in the Kramat District, Tegal Regency, Central Java Province, covering an area of approximately 124 hectares, and is inhabited by 2,918 residents. In order to develop the drinking water pipeline system conducted by Perumda Air Minum Tirta Ayu at the Mejasem branch service unit in 2023, planning has been carried out to ensure the fulfillment of drinking water needs with 100% service coverage for the people of Dinuk Village until 2034. The population projection over 10 years is required to calculate the total drinking water demand, so it can be determined that by 2034, there will be 8,142 people. The total water demand result is used to design the distribution pipe network through simulation in EPANET. The peak demand in 2034, amounting to 14.1649 l/s, is used as the basis for planning. The EPANET simulation produces water pressure ranging from 8.67 m to 29.84 m at 38 points, and the water flow velocity ranges from 0.08 m/s to 1.7 m/s. The EPANET simulation is conducted using PVC pipes with a diameter of 100 mm. This planning results in a cost estimate of IDR 884,679,726." Keywords: water distribution network, pipe network, water demand, Dinuk Village.
Item Type: | Karya Ilmiah (Skripsi) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik dan Ilmu Komputer > Teknik Sipil |
Depositing User: | admin repository upstegal |
Date Deposited: | 20 Mar 2025 03:16 |
Last Modified: | 20 Mar 2025 03:16 |
URI: | http://repository.upstegal.ac.id/id/eprint/10327 |
Actions (login required)
![]() |
View Item |