REDESAIN BENDUNG PONDOH DESA WANASARI KECAMATAN MARGASARI KABUPATEN TEGAL

ISTIANA, ISNA (2025) REDESAIN BENDUNG PONDOH DESA WANASARI KECAMATAN MARGASARI KABUPATEN TEGAL. Skripsi thesis, Universitas Pancasakti Tegal.

[img] Text
SKRIPSI ISNA FIX COVER - BAB 3 - isna istiana.pdf

Download (1MB)
[img] Text
DAPUS - LAMPIRAN - isna istiana.pdf

Download (5MB)
[img] Text
BAB 4 - 5 - isna istiana.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Sumber daya air merupakan unsur utama yang penting dalam kehidupan manusia dan mahluk hidup lainnya serta tanaman untuk kelangsungan hidupnya, air juga merupakan suatu yang sangat penting dalam rangka usaha untuk meningkatkan taraf hidup masyarakat. Oleh karena itu seharusnya air perlu dihargai dan dijaga kelestariannya serta dimanfaatkan dengan baik dalam arti digunakan secara efektif dan efisien. Diketahui iklim indonesia mempunyai iklim tropis basah yang salah satu cirinya kelebihan air di musim penghujan dan sering kekurangan air pada musim kemarau yang mengakibatkan kekeringan (Ardiyansyah, 2017) Metode penelitian yang digunakan dalam perencanaan irigasi ini adalah menggunakan metode penelitian deskriptif. Penelitian deskriptif (penggambaran) ini merupakan penelitian yang akan memprediksikan Eksististing Bendung dan saluranIrigasi pada Daerah Irigasi (D.I) Pondoh di Desa Wanasari, Kecamatan Margasari Kabupaten Tegal. Hal ini dilakukan untuk mendesripsikan, mencatat dan menganalisa kondisi Daerah Irigasi yang terjadi saat ini. Dari hasil Redesain bendung Pondoh ini dimulai dengan mencari data bendung, dan untuk memperoleh hasil berbeda maka penulis mendesain ulang mercu bendung. Bendung Pondoh ini didesain dengan lebar sungai 25 m dan panjang sungai 2 km, dari analisa hidrologi yang dilakukan selama 10 tahun didapatkan debit banjir kala ulang T 3,1 m3/dt. Besarnya debit kala ulang diperoleh dengan metode Haspers. Pada desain ini didapat debit per unit lebar mercu 0,148 m3/dt . Salah satu cara untuk memperpanjang jalannya aliran dibawah bendung ini anatara lain dengan membuat lantai muka yang mana pelaksanaannya lebih mudah. Analisis kebutuhan air bendung pondoh dengan Luas Areal tanam secara keseluruhan 390 Ha, yang terbagi menjadi saluran sekunder pondoh kanan dan saluran sekunder pondoh kiri. Dengan luas yang berbeda disetiap petak. Dalam Proyek Redesain bendung, total Rencana Anggaran Biaya (RAB) telah dihitung sebesar Rp. 1,002,107,000.00-,. Biaya ini mencakup berbagai komponen pekerjaan yang dirancang untuk memastikan keberlanjutan, keamanan dan efisiensi struktur bendung. Dengan Rincian Pekerjaan Persiapan yang mencakup Mobilisasi alat, pembersihan lahan dan penyiapan area kerja, dan estimasi biaya untuk pekerjaan persiapan adalah Rp. 89,162,000,00-,. Bendung dengan lebar mercu bendung 5.85 m, pada elevasi ±104.30, dilapsisi dengan beton bertulang pada sisinya. Saringan menggunakan besi diameter 12 dengan jarak antar celah saringan 3 cm. Kemiringan gorong-gorong pengumpul 0.12 , dengan tinggi 1.5 m dan lebar 2.45 m. Kebutuhan air yang dibutuhkan di Areal Petak Sawah Daerah Irigasi (D.I) Pondoh adalah sebanyak 450 l/dt/ha, yang mana kebutuhan air tersebut akan mengairi petak areal sawah seluas 390 hektar melalui saluran sekunder. Rencana Anggaran Biaya (RAB) yang digunakan dalam redesain ini sebesar Rp. 1,002,107,000.00-,. Kata kunci : Redesain dan Bendung ix ABSTRACT Water resources are an important main element in the lives of humans and other living creatures as well as plants for their survival, water is also very important in the context of efforts to improve people's standard of living. Therefore, water should be respected and preserved and put to good use in the sense of being used effectively and efficiently. It is known that the Indonesian climate has a wet tropical climate, one of the characteristics of which is excess water in the rainy season and often lack of water in the dry season which results in drought (Ardiyansyah, 2017) The research method used in irrigation planning is descriptive research methods. This descriptive (description) research is research that will predict the existing weirs and irrigation channels in the Pondoh Irrigation Area (D.I) in Wanasari Village, Margasari District, Tegal Regency. This is done to describe, record and analyze the current conditions of the Irrigation Area. From the results of the Pondoh weir redesign, we started by looking for weir data, and to obtain different results, the author redesigned the lighthouse weir. Pondoh Dam was designed with a river width of 25 m and a river length of 2 km. From hydrological analysis carried out over 10 years, it was found that the return flood discharge T was 3.1 m3/s. The amount of return period discharge is obtained using the Haspers method. In this design, the discharge per unit width of the lighthouse is 0.148 m3/s. One way to extend the flow under the weir is to make a front floor, which is easier to implement. Analysis of the water needs of the Pondoh weir with a total planting area of 390 Ha, which is divided into the right Pondoh secondary channel and the left Pondoh secondary channel. With a different area in each plot. In the weir redesign project, the total planned budget (RAB) has been calculated at IDR. 1,002,107,000.00-,. This cost covers various work components designed to ensure the sustainability, safety and efficiency of the weir structure. With details of the preparatory work which includes mobilization of tools, land clearing and work area preparation, and the estimated cost for the preparatory work is IDR. 89,162,000,00-,. Weir with a width of 5.85 m, at an elevation of ±104.30, lined with reinforced concrete on the sides. The filter uses iron diameter 12 with a distance between the filter gaps of 3 cm. The slope of the collecting culvert is 0.12 , with a height of 1.5 m and a width of 2.45 m. The water requirement needed in the Pondoh Irrigation Area (D.I) Rice Plot Area is 450 l/sec/ha, which water requirement will irrigate a 390 hectare paddy field area through secondary channels. The budget plan (RAB) used in this redesign is IDR. 1,002,107,000.00-,. Keywords: Redesign and Weir

Item Type: Karya Ilmiah (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik dan Ilmu Komputer > Teknik Sipil
Depositing User: admin repository upstegal
Date Deposited: 24 Mar 2025 02:10
Last Modified: 24 Mar 2025 02:10
URI: http://repository.upstegal.ac.id/id/eprint/10340

Actions (login required)

View Item View Item