LISTIANI, YULI (2025) PENGARUH MANAJEMEN MATERIAL TERHADAP PRODUKTIVITAS KERJA PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA PEKERJAAN STRUKTUR (STUDI KASUS PROYEK PASAR INDUK BREBES). Skripsi thesis, Universitas Pancasakti Tegal.
![]() |
Text
COVER - BAB III YULI - Yuli Listiani.pdf Download (1MB) |
![]() |
Text
4-5 - Yuli Listiani.pdf Restricted to Repository staff only Download (1MB) |
![]() |
Text
dapus dan lampiran yuli - Yuli Listiani.pdf Download (990kB) |
Abstract
Yuli Listiani, 2025 “Pengaruh Manajemen Material Terhadap Produktivitas Kerja Proyek Konstruksi Gedung Bertingkat Pada Pekerjaan Struktur (Studi Kasus Proyek Pasar Induk Brebes)”. Laporan Skripsi Teknik Sipil Fakultas Teknik dan Ilmu Komputer Universitas Pancasakti Tegal 2025. Produktivitas kerja telah menjadi suatu ukuran dalam mempertimbangkan apakah suatu proyek dilaksanakan secara efektif atau tidak. Salah satu faktor yang mempengaruhi produktivitas kerja dalam proyek konstruksi adalah manajemen material. Pada pelaksanaan proyek Pasar Induk Brebes terjadi keterlambatan progress proyek. Keterlambatan proyek konstruksi dapat berdampak pada produktivitas proyek, seperti membengkaknya biaya dan menurunnya kualitas pekerjaan. Produktivitas kerja suatu proyek rendah maka akan menimbulkan dampak berupa keterlambatan proyek sehingga proyek tidak selesai secara tepat waktu dan juga berdampak biaya proyek menjadi meningkat sehingga terjadi penyimpangan biaya akhir proyek. Pada proyek konstruksi biaya material dan peralatan nilainya bisa mencapai 50-60% dari total biaya proyek. Pada penelitian ini bertujuan untuk megidentifikasi pengaruh dominan manajemen material terhadap produktivitas kerja proyek konstruksi dan untuk mencari tahu bagaimana mengatasi masalah manajemen material yang berpengaruh dominan tersebut. Metode penelitian yang digunakan yaitu penelitian studi kasus dan survey dengan melakukan perhitungan terhadap produktivitas kerja proyek Pasar Induk Brebes dan mencari keterkaitannya dengan manajemen material dalam proyek tersebut. Dari data yang yang telah di peroleh, selanjutnya dilakukan analisa data menggunakan aplikasi SPSS (Statistical Package for the Social Sciences) yaitu berupa uji komparatif, analisa deskriptif, uji validitas dan reliabilitas, analisa korelasi, analisa faktor, analisa regresi dan pembuatan model kemudian dilakukan juga uji T, uji F dan uji Multikolinearitasnya. Hasil penelitian yang didapatkan yaitu faktor-faktor dominan dalam manajemen material yang mempengaruhi produktivitas kerja proyek Pasar Induk Brebes dan strategi pengendaliannya. Faktor-faktor dominan yang didapat yaitu variabel X8 (keakuratan dalam pemilihan material) dan variabel X20 (kelangkaan material di pasar) dengan model regresi Y = -1.563 + 0,563 X8 + 0,563 X20. Variabel X8 dan X20 terpilih menjadi variabel dominan yang artinya dari sekian variabel bebas X yang ada, variabel terpilih tersebut merupakan variabel yang paling berpengaruh terhadap variabel terikat Y (produktivitas kerja proyek konstruksi). Kata kunci: Produktivitas, manajemen material, proyek, studi kasus, survey, regresi. viii ABSTRACT Yuli Listiani, 2025 "The Influence of Material Management on Work Productivity in Multi-Storey Building Construction Projects in Structural Work (Case Study of the Brebes Main Market Project)". Civil Engineering Thesis Report, Faculty of Engineering and Computer Science, Pancasakti University, Tegal 2025. Work productivity has become a measure in considering whether a project is implemented effectively or not. One of the factors that influences work productivity in construction projects is material management. During the implementation of the Brebes Main Market project, there was a delay in project progress. Delays in construction projects can have an impact on project productivity, such as increasing costs and reducing the quality of work. If the work productivity of a project is low, it will have an impact in the form of project delays so that the project is not completed on time and will also result in project costs increasing, resulting in deviations in the final project costs. In construction projects, the cost of materials and equipment can reach 50-60% of the total project cost. This research aims to identify the dominant influence of material management on construction project work productivity and to find out how to overcome material management problems that have this dominant influence. The research method used is case study research and surveys by calculating the work productivity of the Brebes Main Market project and looking for its relationship with material management in the project. From the data that has been obtained, data analysis is then carried out using the SPSS (Statistical Package for the Social Sciences) application, namely in the form of comparative tests, descriptive analysis, validity and reliability tests, correlation analysis, factor analysis, regression analysis and model building, then the T test, F test and multicollinearity test are also carried out. The research results obtained are the dominant factors in material management that affect the work productivity of the Brebes Main Market project and its control strategy. The dominant factors obtained are variable X8 (accuracy in material selection) and variable X20 (scarcity of materials in the market) with regression model Y = -1.563 + 0.563 X8 + 0.563 X20. Variables X8 and X20 were selected to be the dominant variables, which means that of the many independent variables X, the selected variables are the most influential variables on the dependent variable Y (construction project work productivity). Keywords: Productivity, materials management, projects, case studies, surveys, regressions
Item Type: | Karya Ilmiah (Skripsi) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik dan Ilmu Komputer > Teknik Sipil |
Depositing User: | admin repository upstegal |
Date Deposited: | 24 Mar 2025 03:32 |
Last Modified: | 24 Mar 2025 03:32 |
URI: | http://repository.upstegal.ac.id/id/eprint/10348 |
Actions (login required)
![]() |
View Item |